| RANDOM ID | Total | Q1 | Bonus | Q2 | Q3 | Late | Comments |
| | 110 | 50 | 10 | 25 | 25 | | |
| NCzJZQ30 | 107 | 50 | 7 | 25 | 25 | | |
| bo2hv4PW | 98 | 50 | | 25 | 23 | | 3. The ranges do not look ok, plot is ok |
| CYBq5LLk | 36 | 38 | | 18 | 0 | -20 | 1. The plots are not ok. 2. The kernel matrix is wrong, 3. Not done |
| 98KIYMfi | 89 | 50 | 3 | 18 | 18 | | 1. Radian is used, the plots are ok. 2. The kernel matrix is wrong, centering and normalization are not done correctly, 3. the plot is not ok (checked with actual kernel); |
| x98+nDiZ | 95 | 50 | | 22 | 23 | | 1. The angles are in radian 2. The kernel is not reported 3. The plots look ok, but the ranges are not |
| +IYanL2o | 93 | 50 | | 25 | 18 | | 1. The plots were not provided in a file, generated from the script 3.The plot is not ok |
| 9Q1oADOO | 98 | 50 | 5 | 25 | 18 | | 3. The projection is not done correctly |
| sUCquJDz | 96 | 50 | 3 | 25 | 18 | | 3. The plot is not ok |
| mwATZivC | 98 | 50 | | 25 | 23 | | 4. The plots look ok, but the ranges are not, the normalizations may not have been done correctly |
| mH+BaJvp | 91 | 50 | | 23 | 18 | | 2. Did not print the full kernel matrix and did not report the sum of the difference between them, printed all, looks ok. 3. The projection is not done correctly. |
| Md4pNgGd | 97 | 50 | | 23 | 24 | | 2. the difference between the matrices is significant (37) 4. Reported all the points instead of the ranges, the plot looks ok |
| G+0u9Irz | 80 | 50 | | 25 | 25 | -20 | One day late submission |
| Ujihbhtt | 78 | 42 | | 18 | 18 | | 1. The distributions plotted wrong, 3. the kernel is computed wrong , the difference is significant 4. The plot does not seem right (checked with actual kernel); Division by zero error encountered. |
| fAOP6JHD | 90 | 50 | | 22 | 18 | | 2. the difference between the matrices is significant (198). 3. The projection is not done correctly |
| MCV3WEYc | 110 | 50 | 10 | 25 | 25 | | |
| klBZVRck | 71 | 50 | | 21 | 0 | | 2. Kernel matrix is ok, transformation to feature space is not done 3. The projection is not done |
| FrEKcoIp | 100 | 50 | | 25 | 25 | | |
| ApZnJghy | 100 | 50 | | 25 | 25 | | |
| j244smYo | 101 | 50 | 2 | 24 | 25 | | 2.The kernel matrix file is empty, printed from the script |
| durm5mQr | 107 | 50 | 9 | 23 | 25 | | 2. Kernel not reported |
| qp3ixHwp | 88 | 50 | | 20 | 18 | | 1. The angles are in radian, 2. The matrix difference is significant (23), the matrix is not reported, 3. The projection is not done correctly, the plot is not ok |
| uyVWukM/ | 106 | 50 | 6 | 25 | 25 | | |
| RaF/WT/5 | 75 | 50 | | 25 | 0 | | 3. No projection is done |
| | 30 | 30 | | 0 | 0 | | 1. no plots provided, 2 and 3 not completed |
| LDhOjkNP | 70 | 45 | | 25 | 0 | | 1. No plots are provided, values look ok. 3. No projection is done. |
| f6o3HJVc | 110 | 50 | 10 | 25 | 25 | | |
| WT8ryljz | 98 | 50 | | 23 | 25 | | 2. The kernel matrix is not reported, only the element wise difference is reported, looks ok |
| YJH6D/T7 | 103 | 50 | 3 | 25 | 25 | | |
| 2h1UahTn | 0 | | | | | | |
| UyhorHJ4 | 35 | 35 | | 0 | 0 | | 1. Did not provide plots, was only able to run for d=10. 2. Did not complete 3. Did not complete |
| usOryPkL | 88 | 50 | | 20 | 18 | | 2. The kernel do not look ok. The difference of the matrices is a bit significant (35). The plot does not look ok |
| Qx9GuQxn | 64 | 43 | | 25 | 16 | -20 | 1. No plots were submitted, the values look ok, 2. The projection seems to be wrong, no plots were generated, could not get it to work; Late submission |
| Qk0VLoX5 | 95 | 50 | 2 | 25 | 18 | | 3. The plot is not ok |
| 0nmJiAx4 | 68 | 50 | | 20 | 18 | -20 | 2. The kernel is wrong, normalization is not done correctly, 3. the plot is not ok, the projection is not done correctly; Late submission |
| Nw6Ws9nD | 0 | | | | | | |
| Kgn7aEvO | 0 | | | | | | |
| /JCj3q3B | 86 | 46 | | 25 | 15 | | 1. The plots are not provided, the code is commented out, the values are ok. 3. Projection is not done, variance is computed |
| +mSdLt6n | 78 | 50 | 10 | 20 | 18 | -20 | 2. The kernel matrix does not look right, 3. The plot is wrong; Late submission |
| XeaZVxsl | 107 | 50 | 7 | 25 | 25 | | |
| 4j/PRnOC | 88 | 45 | | 25 | 18 | | 1. The plots are not done correctly, the variance decrease is not stable. 3. the plot is not ok |
| GRD0+zN3 | 92 | 45 | | 25 | 22 | | 1. Max, min, range, mean, variance not reported. 3. The plot fixed in second submission but was late. |
| aRKsTdGB | 0 | | | | | | |
| C0uekV3b | 87 | 47 | | 25 | 15 | | 1. All plots were not submitted, looks right 3. The projection is not done, the variance is computed |
| Y11qxIks | 96 | 50 | | 25 | 21 | | 3. The plot fixed in second submission but was late, range is not ok |
| hu9niHPx | 100 | 50 | | 25 | 25 | | |